---
product_id: 368590895
title: "The Masonic Exchange Order of Eastern Star Matron Auto Emblem - [White & Gold][3'' Diameter]"
brand: "the masonic exchange"
price: "₨10521"
currency: LKR
in_stock: true
url: https://www.desertcart.lk/products/368590895-the-masonic-exchange-order-of-eastern-star-matron-auto-emblem
store_origin: LK
region: Sri Lanka
---

# 3'' diameter precision size Durable aluminum alloy build Epoxy & clear coat protection The Masonic Exchange Order of Eastern Star Matron Auto Emblem - [White & Gold][3'' Diameter]

**Brand:** the masonic exchange
**Price:** ₨10521
**Availability:** ✅ In Stock

## Summary

> ✨ Drive Your Legacy with Distinction! ✨

## Quick Answers

- **What is this?** The Masonic Exchange Order of Eastern Star Matron Auto Emblem - [White & Gold][3'' Diameter] by the masonic exchange
- **How much does it cost?** ₨10521 with free shipping
- **Is it available?** Yes, in stock and ready to ship
- **Where can I buy it?** [www.desertcart.lk](https://www.desertcart.lk/products/368590895-the-masonic-exchange-order-of-eastern-star-matron-auto-emblem)

## Best For

- the masonic exchange enthusiasts

## Why This Product

- Trusted the masonic exchange brand quality
- Free international shipping included
- Worldwide delivery with tracking
- 15-day hassle-free returns

## Key Features

- • **Show Your OES Pride:** A sleek emblem designed exclusively for Order of Eastern Star sisters, making your vehicle a statement of belonging.
- • **Premium Aluminum Alloy:** Lightweight yet robust, ensuring long-lasting durability and a polished look.
- • **Effortless Installation:** Strong adhesive backing means no tools required—stick it on and stand out instantly.
- • **Weather-Resistant Finish:** Epoxy paint and clear coat shield your emblem from the elements, keeping it vibrant year-round.
- • **Precision Crafted 3'' Diameter:** Perfectly sized for visibility without overpowering your car’s aesthetic.

## Overview

This 3-inch diameter auto emblem from The Masonic Exchange is crafted from durable aluminum alloy and finished with epoxy paint and a clear coat for weather resistance. Lightweight at 18 grams, it features an adhesive backing for easy, tool-free installation, making it the perfect accessory for any Order of Eastern Star sister to showcase pride and affiliation on their vehicle.

## Description

The Masonic Exchange Order of Eastern Star Matron Auto Emblem - [White & Gold][3'' Diameter]

## Features

- Measures Approximately 3'' Diameter
- Made from Aluminum Alloy
- Finished with Epoxy Paint and Clear Coat
- Adhesive Backing for Easy Application!
- Made by The Masonic Exchange

## Technical Specifications

| Specification | Value |
|---------------|-------|
| Manufacturer | The Masonic Exchange |
| Brand | The Masonic Exchange |
| Product Dimensions | 7.62 x 7.62 x 0.33 cm; 18 g |
| Item model number | TME-EMB-00142 |
| Exterior | Aluminum |
| Manufacturer Part Number | TME-EMB-00142 |
| Position | Rear |
| Item Weight | 18 g |

## Product Details

- **Colour:** Multicolored
- **Brand:** The Masonic Exchange
- **Material:** Aluminum
- **Exterior finish:** Aluminum
- **Fit type:** Universal

## Images

![The Masonic Exchange Order of Eastern Star Matron Auto Emblem - [White & Gold][3'' Diameter] - Image 1](https://m.media-amazon.com/images/I/61l586R-q4L.jpg)

---

## Why Shop on Desertcart?

- 🛒 **Trusted by 1.3+ Million Shoppers** — Serving international shoppers since 2016
- 🌍 **Shop Globally** — Access 737+ million products across 21 categories
- 💰 **No Hidden Fees** — All customs, duties, and taxes included in the price
- 🔄 **15-Day Free Returns** — Hassle-free returns (30 days for PRO members)
- 🔒 **Secure Payments** — Trusted payment options with buyer protection
- ⭐ **TrustPilot Rated 4.5/5** — Based on 8,000+ happy customer reviews

**Shop now:** [https://www.desertcart.lk/products/368590895-the-masonic-exchange-order-of-eastern-star-matron-auto-emblem](https://www.desertcart.lk/products/368590895-the-masonic-exchange-order-of-eastern-star-matron-auto-emblem)

---

*Product available on Desertcart Sri Lanka*
*Store origin: LK*
*Last updated: 2026-11-30*